http://www.jobs.ac.uk/job/AGD130/research-associate-in-novel-aerospace-electric-propulsion-modelling-and-control University of Lincoln 12 month fixed term contract Discover your future at Lincoln University of Lincoln School of Engineering Power and Energy Systems Research Institute College of Science – School of Engineering Salary competitive Post reference: ENG5047 The University of Lincoln is seeking to appoint a new Research Associate in the School of Engineering […]
Multibody Advanced Airship for Transport
Meet the MAAT Airship Project Team at AERO Friedrichhafen
Meet the MAAT Airship Project Team at AERO Friedrichhafen, 24th to 27th April 2013, Hall B3, Stand 415.Paul Stewart, Tim Smith and Chris Bingham will be on the stand from the University of Lincoln. http://www.aero-expo.com
Energy Harvesting and Power Network Architectures for the MAAT High Altitude Cruiser-Feeder Airship Concept
Online pre-print publication by UoL academics on the EU FP7 MAAT project • Smith T., Bingham C., Stewart P., Allarton R. and Stewart J., “Energy Harvesting and Power Network Architectures for the MAAT High Altitude Cruiser-Feeder Airship Concept”, Proceedings of the Institution of Mechanical Engineers, Part G: Journal of Aerospace Engineering, Published online before print […]
Energy Harvesting and Power Network Architectures for the MAAT High Altitude Cruiser-Feeder Airship Concept
Online pre-print publication by UoL academics on the EU FP7 MAAT project • Smith T., Bingham C., Stewart P., Allarton R. and Stewart J., “Energy Harvesting and Power Network Architectures for the MAAT High Altitude Cruiser-Feeder Airship Concept”, Proceedings of the Institution of Mechanical Engineers, Part G: Journal of Aerospace Engineering, Published online before print […]
MAAT Demonstrator agreement signed @maatproject
At the end of the second day of technical discussions and negotiations, a final definition for the project demonstrators was signed off by all the WorkPackage leaders. We are now on a timeline to deliver technology demonstrators before the end of this phase of development in 2014.